Extensive preliminary survey of the Robert Campbell Highway, km 10 to km54.
rough grading, phase 3 of Suncor’s Firebag Site.
Siteworks and construction of Crocus Ridge medical staff residence.
Takhini North Subdivision, deep and shallow utilities up to the curb and gutter.
Village of Teslin, LiDAR Survey of Teslin Lake shoreline, LiDAR Survey of As-built Flood mitigation construction, LiDAR based Volumetric Measurement of Materials